The EMC laboratory/Tests achievable

(Difference between revisions)
Jump to: navigation, search
Line 28: Line 28:
 
* need manual rotation of EUT
 
* need manual rotation of EUT
  
For generic standard, the level are displayed on the next figure
+
For generic standard, the level are displayed on the next figure (The limits
 +
for 10 meters are informative, not achievable in the EMC laboratory).<br>
 
[[File:Emission_Enclosure_Generic_Limits_@_3_meters.svg]]
 
[[File:Emission_Enclosure_Generic_Limits_@_3_meters.svg]]
  
  
 
= Emission - AC Port =
 
= Emission - AC Port =

Revision as of 09:58, 26 September 2017

Contents

Usually, the tests are realized from non invasive to invasive over EUT. The personal of EMC laboratory will achieve following measurment








Emission - Enclosure

The well known emission procedure is achievable in the SAC. The keywords to retain are:

  • Respect to IEC 61000-6-3
  • 3 meter chamber
  • horizontal or vertical polarization
  • Quasi peak measurment
  • only 1 meter elevation
  • need manual rotation of EUT

For generic standard, the level are displayed on the next figure (The limits for 10 meters are informative, not achievable in the EMC laboratory).
Emission Enclosure Generic Limits @ 3 meters.svg


Emission - AC Port

Personal tools
Namespaces
Variants
Actions
Navigation
Laws & standards
The EMC laboratory
Standards at library
Browse
Toolbox