Main Page

(Difference between revisions)
Jump to: navigation, search
m (Technical Content)
m (Technical Content)
Line 19: Line 19:
  
 
= Technical Content =
 
= Technical Content =
* '''[[Switzerland: Nuclear power replaced by renewables]]''': Estimation of storage needs and possible contribution of Demand Side Management / Demand Response
+
* '''[[Switzerland: Nuclear power replaced by renewables]]''': Estimation of storage needs and possible contribution of Demand Side Management / Demand Response (''WP1: Jean-françois Affolter'')
  
* '''Elements modelling''': Physical models for category of elements for the simulator
+
* '''[[Elements modelling]]''': Physical models for category of elements for the simulator (''WP2: Thierry Robert'')
  
 
* '''[[Simulator design]]''': Design of a framework for the definition of the simulated system and of control strategies and for the execution of simulation scenarios  
 
* '''[[Simulator design]]''': Design of a framework for the definition of the simulated system and of control strategies and for the execution of simulation scenarios  

Revision as of 10:47, 18 February 2014

Welcome to the Wiki of the Project Agreflex

Contents

HESSO Valais Wallis Logo
This is the knowledge database of the project Agreflex.

Find more information about our technical and educational program in the UIT Wiki or FSI Wiki.


link=Help:http://wiki.hevs.ch/optigrid/index.php?title=Special:RecentChanges&feed=rss Get informed about all changes to this wiki by signing up to this RSS feed

Administration

Preliminary Study

Technical Content

  • Elements modelling: Physical models for category of elements for the simulator (WP2: Thierry Robert)
  • Simulator design: Design of a framework for the definition of the simulated system and of control strategies and for the execution of simulation scenarios
  • Optimisation strategies: Design of distributed optimisation algorithms
  • Simulated scenarios and their assessment: Simulation scenarios results with performance assessment
  • Considerations on deployment: Regulatory, economical and technical considerations on the deployment of demand side management / demand response systems
  • Services for system operators and suppliers: Elaboration of a "joystick" for system operators and / or suppliers
  • On-site measurement: Validation of key points through on-site measurement

Getting started

Use the Navigation to the left to enter the different sections or follow any of the following links:

Personal tools
Namespaces
Variants
Actions
Navigation
Technical Content
Browse
Toolbox